Industrial services/API 650 tank manufacturer in Egypt

API 650 storage tanks fabricated and erected in Egypt

API 650 is the reference standard for welded atmospheric storage tanks, and buyers in Egypt's petroleum and gas sector treat it as a pass/fail requirement rather than a preference. Meeting it is not a matter of copying a drawing: it needs qualified welding procedures, controlled plate handling, a disciplined NDT regime and a document dossier that a third-party inspector can accept at first submittal.

API 650 tank manufacturer in EgyptEgyptian General Petroleum Corporation (EGPC), Approved Supplier, Reg. No. 124
Request a Quote

What the scope covers

TARRADCO has been fabricating tanks in Alexandria since 1985. Egyptian General Petroleum Corporation (EGPC), Approved Supplier, Reg. No. 124. Our management system is certified to ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018.

  • Welded atmospheric tanks to API 650 for crude, product, water and process service
  • Shell course rolling, bottom and annular plate layout, cone and dome roof structures
  • Nozzle and manway sets, reinforcing pads, stairways, platforms and handrails
  • Welding to qualified procedures, with welder qualification records issued in the dossier
  • Radiography, ultrasonic, dye-penetrant and vacuum box testing as the ITP requires
  • Hydrotest, settlement monitoring and handover documentation
  • SA 2.5 blasting and airless coating, internal lining to the specified system
  • Site erection crews: qualified welders, pipe fitters and riggers from our own workforce

Certifications & standards

  • Egyptian General Petroleum Corporation (EGPC), Approved Supplier, Reg. No. 124
  • Triple ISO certified: 9001:2015, 14001:2015 and 45001:2018
API 650API 620ISO 9001:2015ISO 14001:2015ISO 45001:2018ISO 12944SA 2.5
View certificates

What moves the price

The variables we quote against

01

Diameter, height and shell course count against the API 650 design basis

02

Plate grade and any stainless or clad requirement for the stored product

03

Roof configuration, including internal floating roof where vapour loss matters

04

Radiography percentage and third-party witness points defined in the ITP

05

Internal lining and external coating system to ISO 12944 exposure class

06

Shop fabrication versus field erection, and access at the receiving site

Confirmed figures

  • Largest tank delivered to date: 30 m diameter
  • 400–1,000 tonnes fabricated per month at the Alexandria yard, depending on workload
  • 100 qualified welders on the permanent payroll

The yard

Alexandria yard capability

Our head office and main fabrication yard sit at OM Zegio, behind the EZDK factory in Alexandria, on a facility of more than 20,000 m², working since 1985.

Tour the factory

Large Sheets Rolling Machine

Heavy plate rolling up to industrial thickness

CNC Plate Cutting Machine

2.5 × 12 m bed — precision plasma & oxy-fuel

Submerge Automatic Welding Machine

18 m linear travel — high-deposition SAW

Hydraulic Press Brake

Heavy-section bending & forming

Punching & Notching Machine

Profile cutting, hole punching, slotting

Overhead Cranes (multi-bay)

Yard-wide lifting across a 20,000+ m² facility

Sandblasting Chamber

SA 2.5 surface preparation to spec

Airless Painting Systems

Industrial-grade protective coatings

Petroleum & gas sector clients

Names already published in our client list on this site.

PetrojetEnppiGASCOPetrobelGUPCOEGPCAGIBAAlexandria PetroleumEgyptian Refining Co.SUMEDPetromaintAbu Qir Fertilizers

Request a quote

Send your API 650 datasheet and ITP and we will come back with a fabrication programme and a price.

Request a Quote

Next Step

Send us your drawings — get a costed, deliverable answer.

Scope, materials and schedule reviewed by our own engineers. No brokers, no subcontract chain.

Request an RFQ